Engagement Model

We survey on site, deploy, then prove it at SAT — and stay accountable for the result.

Lab automation runs in five steps: survey, proposal and quote, PoC, deployment with SAT on site, then operations and SLA. Regulated clients can add IQ/OQ/PQ at step 4. The structure is public up front; the final number depends on site scale, integration complexity and hardware BOM.

Five-step delivery (with post-deployment SAT)

Step 01Free

On-site survey

Completed within one week

  • Survey workstations, instrument interfaces and environment
  • Measure material flow, network and power conditions
  • Scope recommendation and feasibility read-out

Deliverables: Site Survey Form, Scope & Feasibility Note

Step 02Fixed fee

Proposal & quotation

5–10 business days (2026 Q4 pricing)

  • Solution design and deployment options (on-prem hardware + cloud platform)
  • Integration scope and service tier
  • Phased quotation; contract signed before the next step

Deliverable: Solution Proposal with deployment and cost structure

Step 03Fixed fee

PoC pilot

4–12 weeks

  • Single-scenario run-through, workflow authoring, metric capture
  • Output signal-level accuracy, cycle time and ROI
  • Go / No-Go package

Deliverables: PoC Report, Signal Metrics Sheet

Step 04Milestone

Deployment, SAT and compliance validation

Deployment 2–4 weeks; SAT 1–2 weeks; IQ/OQ/PQ optional 2–6 weeks

  • Install hardware on site, integrate instrument interfaces and line
  • Measure the four acceptance metrics, signed by both parties
  • Optional IQ/OQ/PQ validation mapped into the client QMS

Deliverables: Deployment Record, signed SAT Report, IQ/OQ/PQ pack

Step 05Annual · renewable

Operations & service SLA

12 months · renewable

  • Three tiers: Remote / Scheduled On-site / Resident
  • Quarterly KPI review: cycle time, availability, acceptance rate
  • Defects, security patches and retraining

Deliverables: SLA Response Log, Quarterly Outcome Report

01 free; 02–03 fixed fee; 04 milestone-based; 05 at 10–20% of the annual contract value. Hardware BOM and added scope are quoted separately.

Acceptance metrics (measured at SAT)

If it cannot be measured, it does not go into the contract. Only the four items below enter the SAT Report: the PoC gives signal values, SAT gives the acceptance values.

Cycle time

Batch processing time

  • ≤X minutes per batch (full batch of Y samples)
  • Average of 3 consecutive batches; a miss fails the test

Accuracy

Robot positioning accuracy

  • ±0.3mm (n≥20 repeated moves, worst-case deviation)
  • Baseline and measured log both recorded in the report

Response

Configuration lead time / recovery

  • New requirement configured in <7 days
  • Recovery time per contract

Traceability

Sample-level traceability

  • Trace record completeness target 100%
  • Exceptions flagged and logged separately, never counted as passes

Reference outcomes (not in the acceptance table)

  • Maintenance cost down ~20%
  • Labour input down ~30%
  • Line efficiency up ~50%

Partner reference data (Hinton Lab) plus a single client case; not a contractual commitment and not part of acceptance — acceptance recognises only values measured in the SAT Report.

Compliance & validation

IQ/OQ/PQ documentation is provided per client QA requirements and maps directly into the client QMS. ISO 15189 is the laboratory's own accreditation; we supply the validation evidence and do not claim to hold it. Whether the equipment constitutes a medical device is assessed per project and local regulator.

Three service tiers: Remote / Scheduled On-site / Resident

Tiers follow how much on-site presence you actually need; residency is arranged per client. A 24/7 hospital laboratory can be quoted under Resident.

Remote

10–14% / year

For deployments with predictable change cadence.

  • Business hours (Mon–Fri 09:00–18:00 HKT), P1 within 4 hours
  • Monthly equipment health check + quarterly model retraining
  • Standard version upgrades and security patches
  • Dedicated PM, shared engineering pool

Scheduled On-site

15–20% / year

For scenarios that need regular on-site work.

  • Everything in Remote
  • N engineer-days on site per month (N per contract)
  • On-site change implementation and line commissioning
  • Named engineering lead, auditable change log

Resident

By quotation

Arranged per client need; for critical paths and regulated environments.

  • Full-time on-site on business days, or 24/7 shift coverage
  • P1 within 1 hour
  • Dedicated engineer stationed on site
  • Quarterly executive review and compliance document upkeep

Percentages apply to the annual contract value; the one-off delivery fee (including hardware BOM) and the annual service fee are priced separately.

Where we commit, and what we commit

We serve four markets, but not with the same promise.

MarketTeam & on-siteData residencyLanguages
Hong KongLocal team, on-site as requiredHosted locally, data does not leave Hong KongEnglish
Greater Bay Area / MainlandHK team supports; cross-border on-site as needed (travel billed)On-prem deployment available, residency per contractEnglish
SingaporeMostly remote; local partner on site as neededSingapore residency availableEnglish
JapanOn-site survey where appropriate, delivered by local partners; no resident team in Japan — recruiting local partnersPer contractJapanese / English

“On-site” means an engineer attends the client site to implement, not 24/7 residency.

Payment modes

One-time

Survey / PoC / Hardware

The on-site survey is free; PoC fees and hardware SKUs are billed once. Payment milestones follow kickoff and acceptance.

Staged

Industry projects

Industry solutions across the three directions are billed in stages against deliverables and acceptance metrics — not as a one-time quote.

Subscription

SLA / Operation

The Production & Operation SLA is billed annually (or quarterly on Enterprise). Auto-renewal opt-in.

Settlement currencies

Invoices are issued from Hong Kong by default. We settle in five major currencies via our Bank of China (Hong Kong) multi-currency corporate account — CNY is received as offshore RMB (CNH). FX rates use the prior business day's mid-rate published by HKMA, or a contracted rate for multi-year deals.

HK
HKD
Hong Kong Dollar
SG
SGD
Singapore Dollar
JP
JPY
Japanese Yen
CN
CNY
Chinese Yuan (CNH)
USD
USD
US Dollar

Pricing on this page is indicative as of 2026 Q4 and may be updated quarterly. Final pricing is confirmed in the SOW.

Book a free on-site survey?

Tell us the scenario and we'll come back with a scoped proposal within 5–10 business days.